⥃ Switch to Residential

Merbau Herringbone floor

An extension to the Harp bar, Belfast; the existing floors in the upstairs bar had to be extended across a large open bar area, incorporating a two strip border. The existing timbers were then sanded and sealed along with the new Merbau timbers to achieve a uniform finish.





About this project

PROJECT The Harp Bar
LOCATION Cathedral Quarter, Belfast, Northern Ireland
WOOD(S) USED Solid Merbau, mixed grade herringbone
Timer Dims 350mm x 70mm x 20mm
FINISH Junckers BasePrime & Junckers Satin HP lacquer